HomeMy WebLinkAbout1-201-281
BEGINNING OF CONTRACT No. 7303
(EAST 81 WEST FENCE LINE)
t�
�+
�
ker '-- co 0
�• �x�
INSTALL End posts as shown and
as directed by the engineer _ ; _ - - - Q Q
/
0 X+
CIO
Existing chain link fence
may be temporarily \ \ INSTALL 4' wide walk gates
removed for access during \\ \ \ at Sta. 71 +00 t, Per S.o I51 5 j - o
fence instnllation. and as directed by the
Engineer
/s
\1-_INSTALL 10,550'± �f G' high chain link
fence per 5. P 1518 and as directed
by the Engineer, (See R/W Clegrcance
Deta i I this d rwg. )
Chain link —
fence fabric
7" Except where -
otherwise indicated
on the plans
R/W line -
Fence post
Natural
ground
R/W CLEARANCE DETAIL
NO SCALE
4-
Existing
Culvert /
o v
C9 C
C9 rV
o)
c
k
F. C. D_ R/W----'(
PLAN,
I" = 60'
LEGEND:
—x x— Chain link fence
to be installed
—o Existing fence
INSTALL Corner post as
shown and as directed by
/ the Engineer �—
®'�__ �•� Existing concrete channel
Existing fence — — —
I a
N ro
<o
39 S q�
ORCHARD AVE
�( KINGSLEY
W CITY OF ONTAR IO
a H OLT
W W W
Q Q >
STATE a ST.
MISSION
cn
a
U
6:1
AVE.
BLVD.
a
PRE -BID JOB o
SHOWING 3
a
l � v
TO SAN BERNARDINO
22 mi.
ONTARIO
INTERNATIONAL
AIRPORT
Q Q \��£RS/OF
a
w
a
J FRANCIS �� _�I ST. L
o 0
w J
3 � >a•- m
PROJECT W -
Y 2 =
Q — U
0] >
PH1LA (ELP�HIA ST.
ELY BEAASINS a
PROJECT LOCATION MAP
-Existin 8" water line
(Prote-N in place)
Exi5ting3 fence N�
.L
V
F.C. D. R/W v z
0-0 c_-o—
,--ACCESS Within this hydromulched i _ _ _ — — — — _ — _ — — —
to be w;th the `y — — — —�
area e co -or Y'f � �' ,� -� ,�-Existing channel � i.�� — _..-- -'" d- �
City of Ontario Mirka� Depfi / i ==X_
,
„C
---PLACE Chain link fence 3 inside 3 = ' 6 �
Exist. eucalyptus trees Q17O 5� / / / , F. R/W
X �„ R/W along existin tree line I �`
9 9 INSTALL G' high chain link fence to
Ft I
INSTALL End post os / / / / yP INSTALL 4' wide w4lk�
shown and as directed Exis . euen tus trees
by the Engineer Existiedestrian bridge gate., at Sta. 50.40±, �� I I INSTALL 16' double drive gate
ng p
per S.P. 1516 and as Exist . 3 gas line �- •in Acacia St. per S.P. I 15 and
directed by the Engineer (Protect in place.) I as d I retied by the Eng I neer.
INSTALL ro' high chain link fence
X "�
2�2'
10. / 1/, - INSTALL. 4' wide walk cites PLAN
/ / IQ at St'a. 5 8 -�- 90 ± , Per S. P 1515
\� S and as d i rected by the I = 60 Standard Plat: 15 I B
('� Engineer
GENERAL NOTES:
Afo,� o�cc /< 1) Al I new and established tfant5 on levees
rind within F.C.D. R/W to e Protected In place.
Chain link fence fnbric to be installed with knuckled
finish on top.
3) All fence alig nmen+s will be flagged by Flood
Control District prior to installation.
4) All grading and clearing necessary for fence
• installation to be done by others.
5) These plans depict all active utilities known bg
the District to exist at this time except
individual private services.
10/70 DIETERICH-POST CIEARPRINT 102"
ss Vt<UjtU l NO. wZ)-LHLIr.-'+J'-t
CONTRACT No. 7303 SM. I df
\ i�
I
F C. D. R/W----`
F. C. D. R/W
Existing fence
-- o ---o- o-- o
9
Existin concrete chnnnet
—
--_. _..-----i---- ---- - ----- _ _ --r--. --- --- --F-
- — — — — — —`� — — — -- +--------- — m _ _---- -- - -+— -- - - --_+
4. Existi nq ch4nne.l -
INSTALL. 4' wide walk ggate, at----- A
Sta. 40 -+-00 ±, per S. P 15115 and
as. directed by the Engineer.
INSTALL G' high chain link fence
(See Drwg. 1' for detail)
PLAN,
I " = 60'
-
N -•E � � w � •
cr
.c
J
r
F.C.D. R/W
o
-'--F.C.D R/W
INSTALL 4' wide walk gate, at
Sta. Z5+65±, per S,P. ISIB and as
directed by the Engineer.
�
25' -INSTALL End post as shown and INSTALL 6' high chain link fence
J
Existing fence--,, o as directed by the Enc3 i neer (See gD rwg. 1 for detail)
Existing concrete channel x X
— — — — — -- o _ -- — — — — — — Existing channel
—
+ ----�'��Existing ---- c — — — — — _
Culvert
N F,C.D. R/W I -� � Existing concrete chaanne!
d INSTALL G' high chain link fence 25- INSTALL End post as shown and INSTALL G' high chain link fence
(See Drwc3. 1 for de-tni l) INSTALL End post- y
as shown and as as directed b the Engineer (See 9Drwg. 1 for detaif)
directed by the X x _� X
Engineer -
. I cn
U
� a �
c+n +:
PLAN,
III = 60'
END OF CONTRACT No. 7303
(EAST FENCE LINE)
ACCESS Within this hydromulched
area to be co-ordinated with the
Cify of Ontario Parks Dept,
Existing fence
and gate
T
V)
C. D. R/W
X x —V—
,--Exist. 15" sewer I ine
(Protect in Place)
— _mac Y X
0 I '-- F. C. D. R/W
INSTALL 4' wide wal k �ates at
Sto. I4+-80±,per S.P.11 B and
as d i recte.d by the Engineer
CONNECT G' high chain \� �\ �--� / E LY BASIN No. I
link fence to existQn g o
gate post as directed k
N by t he E n9 i neer / 00
AX
INSTALL 4' wide walkte,
ACCESS Within this hyer dromulched at Sta. 5+95t, p5.PI�aI6 ��GG
area fio be-ordinated with the and as directed b the '�°� I I I
City of Onforic Parks Dept. En ineer y ��t de
A:
INSTALL 6' high chain link fence � I INSTALL End posts as—
(5ee Drwg. 1 for detail) shown and as directed
F.C. D. R/W 0 N -0j by the Em3 i neer
X X —
I X x X-- x x
--1 Existing cone, channel
— — _ C Existing channel
+ — — -- Q 0
0 —fence.
fen
INSTALL G' hi e o v o a oExi-st-0 9 0
p Existing drain pipes � gh chain link fenc
+ (Protect in place) I (See Drwg. 1 for detai 1)
F.C.D. R/W� "
0 x X--�-X —_ x o\ �j Existing tamarix trees
C. D. R/w x o j
Ai
V)F. - posts En INSTALL
p sts as shown and 4s
7
- 1 ,�
ACCESS Within this hydromulched directed by the Engineer
area to be co-ord i nated with the / 3 \ ' PLAN,
City of Ontario Parks Dept.
Exist: 8" wafer line Exist 12" sewer fine 1" 60' LEGEND:
(Protect in place) a (Protect in place)
0
w
U
END OF CONTRACT No. 7303
(WEST FENCE LINE)
—X—X Chain I ink fence
to be installed
Existing fence
.- .
NOV 27 1973
Standard Plat: 151 B
R E V I S 10 N S SAN BERNARDINO COUNTY
MARK I DATE DESCRIPTION BY: FLOOD CONTROL DISTRICT
I 11-2-7-73 AS BUILT R1L. WEST CUCAMONGA CREEK SYSTEM
DESIGNED BY: DRAWN BY: CHECKED BY:
C. B. W.S.G. S. M. R. / y�
RECOMMENDED BY.
C , ENGINEERING IO
APPRr`VEC BY
BOUNDARY FENCING
WEST CUCAMONGA CHANNEL
MISSION BLVD. TO ELY BASIN
DATE SCALE FILE NO. DRWG NO.
6-7-73 AS SHOWN 1-201-`8 2 of 2
CONTRACT No 7303 Sht. a of G
10/70 DIETERICH-POST CEEARPRINT 102M
t
.ram -I Fk5i �,VIv 11(Ui- ENG-1 f
PROJECT No. WS-CAL I F-434