Loading...
HomeMy WebLinkAbout1-114-03STRUCTURAL NOTES: 1. DIMENSIONS FROM FACE OF CONCRETE TO STEEL ARE TO CENTER OF BAR AND SHALL BE TWO INCHES UNLESS OTHERWISE SHOWN. 2. CONCRETE DIMENSIONS SHALL BE MEASURED HORIZONTALLY OR VERTICALLY ON THE PROFILE, AND PARALLEL TO OR AT RIGHT ANGLES (OR RADIALLY) TO CENTERLINE OF CHANNEL ON THE PLAN EXCEPT AS OTHERWISE SHOWN. 3. ALL BAR BENDS AND HOOKS SHALL CONFORM TO THE AMERICAN CONCRETE INSTITUTE'S "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" SECTION 801 4. PLACING OF REINFORCEMENT SHALL CONFORM TO THE AMERICAN CONCRETE INSTITUTE'S "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" SECTION 803. 5. TRANSVERSE CONSTRUCTION JOINTS SHALL NOT BE PLACED WITHIN 30 INCHES OF JUNCTION STRUCTURE OPENINGS. 6. TRANSVERSE CONSTRUCTION JOINTS IN WALLS AND SLABS SHALL BE IN THE SAME PLANE. NO STAGGERING OF JOINTS WILL BE PERMITTED. TRANSVERSE CONSTRUCTION JOINTS SHALL BE NORMAL OR RADIAL TO THE CENTERLINE OF CONSTRUCTION. 7. THE TRANSVERSE REINFORCING STEEL SHALL TERMINATE ONE AND ONE HALF INCHES FROM THE CONCRETE SURFACES UNLESS OTHERWISE SHOWN ON THE STRUCTURAL DETAILS. 8. LONGITUDINAL STEEL SHALL TERMINATE TWO INCHES FROM TRANSVERSE CONSTRUCTION JOINTS. 9. EXPOSED EDGES OF CONCRETE MEMBERS SHALL BE ROUNDED OR BEVELED. 10. NO SPLICES IN TRANSVERSE STEEL REINFORCEMENT WILL BE PERMITTED OTHER THAN SHOWN ON THE DRAWING WITHOUT APPROVAL OF THE ENGINEER. NO MORE THAN TWO SPLICES WILL BE PERMITTED IN ANY LONGITUDINAL BAR BETWEEN TRANSVERSE JOINTS. SPLICES SHALL BE STAGGERED. 11. LONGITUDINAL STEEL SHALL BE LAPPED 20 BAR DIAMETERS AT SPLICES. TRANSVERSE STEEL SHALL BE LAPPED 30 BAR DIAMETERS AT SPLICES. 12. TRANSVERSE JOINTS SHALL BE SPACED NOT TO EXCEED 50 FEET NOR BE LESS THAN 10 FEET, MEASURED ALONG THE CENTERLINE OF CONSTRUCTION, EXCEPT AS OTHERWISE SHOWN ON THE DRAWINGS. 13. TRANSVERSE JOINTS SHALL BE PLACED AT THE JUNCTION OF RECTANGULAR OPEN CHANNEL SECTIONS WITH CLOSED CONDUIT SECTIONS. 14. THE INVERT AND TOPS OF CHANNEL WALL SHALL BE STEEL TROWELLED AND PROTECTED AGAINST DAMAGE AND SCARRING 15. ALL BARS SHALL COMPLY WITH A.S.T.M A-615 GRADE 60 STEEL AND ALL CONCRETE SHALL HAVE MINIMUM STRENGTH OF f'c=4000 psi w w > > W Q Q > a EUC ALI PTUS avE. PROJECT `'�,� o Ir- S I T E °� aUl CHINO 9 °x HILLS > PARKWAY w 4-1i0 F- RFssk. o \4y� w z JI wl a .. LAKE LOS SERRANO$ n17 BLVD. VICINITY MAP NO $CA LE �i CONTINUOUS GRAVEL 1 C.F. AGG. IN BURLAP SACK 1� \ 3/4 \\ GRAVEL DRAIN MATERIAL\ \ 6' DIA. PERF. PIPE \ 18" RECOMMENDED FOR APPROVAL PIPELINE AVENUE IMPROVEMENTS 2/167199 DATE CHINO VALLEY REGIONAL MANAGER k"on CL. `V� DATE I� /19 !,qp DIRECTOR DEPARTMENT OF TRANSPORTATION AND FLOOD CONTROL DATE RICHARD A. BUEERMANN PE. RCE 11900 DISTRICT ENGINEER, COUNTY SERVICES AREA No. 70, ZONE CH NBSAOWRY SAN BERNARDINO COUNTY FLOOD CONTROL DISTRICT PLAN FOR CONSTRUCTION ON CARBON CANYON CHANNEL FROM PIPELINE AVE. TO HWY. NO. 71 CHINO, CALIFORNIA CONTRACT NO. BUILDING LINE A.C. PVMT. (SO TH SIDE ONLY) i " \ --I- 4 \\ LIMITS 95% i \ COMPAC N 5'-0" \ LIMITS OF —� \\ COMPACTION I \ A5 DIRECTED BY I 4" DIA 1 \ SOTS ENGNEER I O 15' 5'-0" \\ _ INTER LLALTERNATE "A" 4DIA. WEEP HOLE O 15' ON CENTER INTERIM F.L a/ 17 ..�� • \\,y 0 lam' 4,k h� ^� ��� FUTURE WEEP HOLE DO NOT DRILL 12" .' ..::' 1' ROCK BLANKET HANN SLAB FILTER l 5' BEDDING MATERIAL ALTERNATE "B" BACK OF WALL DRAIN BACK OF WALL DRAIN -� MIRADRAIN CORE WITH FABRIC FILTER ON THE I EARTH SIDE I (800) 438-1855 BENCHMARK: \ BATTER \\ I \ I \ I I 3/4 \\ I i \ I HOLE VTER L 1 IN RIM UNCOMPACTED /-ECTED FILL MATERIALS 1 ABRIC FILTER FUTURE WEEP HOLE DO NOT DRILL V ROCK BLANKET TYPICAL CHANNEL SAN BERNARDINO COUNTY B. M. d A-6 CHIS lot N. END N-W CURB RETURN PIPELINE & CARBON CANYON RD. ELEV. = 652.67 BASES OF BEARING: HANNEL SLAB BEDDING MATERIAL 1' THICK BOTH SIDES CTION THE BEARING OF N00024'15"E AS SHOWN FOR THE CENTERLINE OF PIPELINE AVENUE ON PARCEL MAP NO. 7614 FIELD IN BOOK 78 PAGES 84 AND 85 OF PARCEL MAPS WAS USED AS THE BASIS OF THE BEARINGS FOR THIS PLAN DRAWING INDEX SHEET NO. DESCRIPTION 1 TITLE SHEET & DETAILS 2 PLAN & PROFILE STA. 126+00 TO STA. 133+00 3 CHANNEL DETAILS 4 CHANNEL STRUCTURAL DETAILS GENERAL NOTES: 1. ALL RECTANGULAR OPEN CHANNEL WALLS SHALL BE FENCED AS SHOWN ON THE DRAWINGS. 2. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, IN CURVED SECTIONS THE MAXIMUM SPACING OF BARS SHALL NOT EXCEED THAT SHOWN ON THE TYPICAL SECTIONS. STEEL SHALL BE PLACED RADIALLY FROM THE MAXIMUM SPACING. 3. AT THE BEGINNING AND ENDING OF ALL POURS, A COMPLETE CURTAIN OF REINFORCEMENT COMPOSED OF ALL BARS SHALL BE PLACED THREE INCHES FROM THE TRANSVERSE CONSTRUCTION JOINT. 4. ALL WORK SHALL BE IN ACCORDANCE WITH THE "STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION 1985 EDITION" INCLUDING SUPPLEMENTS. 5. ALL BACKFILLS AND FILLS TO BE USED AS SUBGRADE SHALL BE COMPACTED TO A RELATIVE DENSITY OF 90% UNLESS OTHERWISE SPECIFIED, BY PROJECTS SOILS ENGINEER. 6. PIPE SHALL BE EMBEDDED 5.5 INCHES INTO ALL STRUCTURES INCLUDING INLET 6 HEADWALLS, UNLESS OTHERWISE SPECIFIED. 7. THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THESE PLANS AND THE REQUIREMENTS OF THE STATE-S STANDARD SPECIFICATIONS. 8. A CONSTRUCTION PERMIT SHALL BE OBTAINED FROM THE SAN BERNARDINO COUNTY FLOOD CONTROL DISTRICT PRIOR TO START OF ANY WORK. RIPRAP NOTES: 1. ROCKS FOR GROUTED RIPRAP SHELL BE GOOD QUALITY BROKEN CONCRETE AND/OR RIVER RUN ROCK, THE SMALLEST DIMENSIONS SHALL EXCEED 3 INCHES AND THE LARGEST DIMENSION SHALL NOT EXCEED 18 INCHES THE LARGEST DIMENSION SHALL NOT EXCEED 4 TIMES THE SMALLEST DIMENSION. 2. THERE SHALL BE A GROUT BED OF AT LEAST 2 INCHES BENEATH THE FIRST LAYER OF ROCK, ALL THE VOIDS BETWEEN THE ROCKS SHALL BE FILLED WITH GROUT, MAXIMUM SPACING BETWEEN ROCKS SHALL BE 2 INCHES 3. SURFACE ROCKS SHALL BE IMBEDDED FROM 1/2 TO 2/3 OF THEIR MAXIMUM DIMENSION. NOTES: CONCRETE MAY BE SUBSTITUTED FOR THE GROUT. PRIVATE ENGINEERS NOTICE TO CONTRACTORS: THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THIS MAP. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN AND AN OTHER LINES NOT RECORD OR NOT SHOWN ON THE DRAWING 1;?Ilge MO SAHEB P.E. No. 33508 DATE SPECIAL NOTE FROM PRIVATE ENGINEER TO CONTRACTOR Contractor agree that he shall assume sole and complete responsibility for job site conditions during the course of construction of this Project, including safety of all persons and property; that this requirement shall apply continuously and not be limited to normal working hours; and that he th.s Contractor shall defend, indemnify and uold the Owner and the Engineer harmless frost any and all liability, real or alleged, in connection with the performance of work on this Project, excepting for liability arising from the sole negligence of the Owner or the Engineer. +L. ma ® "ram �a� �• m dip ��. ��,.L.! ,1111E °IOIIIII w'ills�� aoil ' € ® Nil r '.� ilii.�.—_ � ', � wl�wlcwlwwll #°wlf liiil�ii ,� �,�a► � IIII�I�'t�_��1�IIY --� �! � r�In jig Now .11K .f.. __. ... ... _ ...._ .... .... .. ..._ _ .. . _ -.. ... .... _ ... ... .... __ _ _-__ _I __ - .._ _ - ... ..-. _...__ • . ............................. .................. ......... .._..._ L.A. ....f.1" ..f... _ ....... _ ... ... .... :- ... ... .. ... ... - !' .... 1.. .. - .... ............... .p.. ...................... ..._...._.... _.. .................... .......... f _..._:............................... ........_.:.......... ... P .................... ......... ...-.-.... ........ ...... ......... ..p......... .- .._....... ......... �......... .................... _ - .. .... ._.. ._- .... .... .... _ ....0... - 133 132 Z2 ROCK 131 2$ ROCK 2130 2 ° R«1< 2s RWJ(, 301129 2°-128 100' (9 3' Rcc.K 127 126 125 n 124 PROPERTY LINE 20' EX. 80 ' R/N OF S.8.C. F.C. 0. EX. S' 8 0.F. C.O. EASEMENT QO I NO WEEP LADLES WERE PI V DELETED � Ma 12 f 12' N ti '\\�\ \`\ �\ ` \ % Ml x CHANNEL ' � � E _ _ _ ,- �.� � \ \� \ ; \�\ `� \ , � � ,• ° ¢ � A.C. PVMT. PER DRILL 2 "Fi �+ 6 ' C.L. FENCE PER GRAD/LAG PLAN HOLES@ 10,0•C.CALTRANS STD•,f-10 WEEPHOL6S PER t� _ —, — — — — — , \ �--\ - •. r r I / �\ �_ _ DETAIL ON 2°i, MIN I . _ _ _ - e„ CRUSHED — — — — — — — — \ ` \ \ " + t , r _ 'SHEET 1 x �--- - I -- ; \\\\\+ `\ `�+ �� \� \�` \ \ •� - AGGREGATE B —OTORE MAUL AZ16PMCIJT �, � \\\ \\ , \\ \\`\`\\ f' \ -� coMPAcrED --- x i / a0 \\\ \\ \\\\ \ \\ A.C. WAS NOT PUT DOWN \ W \ \ W I - - TD BE DE TE,P/�L�l1�D - A'T o m - \` �� `I \\\ \\; \ ' \ \ �1 \ ^.. jQ C. CHANNEL PER FILL -' I E - - o O o . �' a• \\ \ \`� \``� .t ` \ , , 645 DETAILS ON SHEET 4 A LAT-E)P �AT�_ 65 EX. GROUND _7_SELECTED NATIVE J ROCK BLANKET FUTURE WEEPHOLE l2" MAX • LEDGF h -4 - _ - MATER/AL UNCOMPI9CTE0 SEE DETAIL ON h, o tc, , SO. CALIF. EDISON CO. EASEMENT ti W Q \� \ .` ROCKS OR BOULDERS I _ W W W Q Q Q "\ �� \ BACK F/C L SHEET f PER 0. R. 1500163 �" Z ti h O t c� , W \\ �\ _ -= CONST. iW4NNEL IMPROVEMENT W ,- �a R r? _ _ fUTURE WEEPNOLf r- �. PER TYP/6At--SECT/ON HEREON - - _ - - - - - \ - - - y o \ O \` - ` \`\\\ \\ SEE DETAIL ON �j ' SHEET 1 -_---�'_ - c+ X r-: --� -- �X-----=x ��-- --X- -- -- X--_�--x �'1\\ _---�l( ---_ --� ____---_ -- - -_ _ __---___===__ ====___-Tr__- _�,-_----_---_----___----- _- ---------_----- - �- — -- - _ -- =-=_- _ ------__-__-- _,-_ RECT. CHANNEL TYPICAL SECTION '-24 I „ „=64s--- - * 50 TO STA. 132+00.00 44 R.C.P. ---� qg —SEE DETAIL K STA. 126 67. EX. 80X CULVERT PER - I e 4.6% II ON SHEET 3 48 �' C.L. f EAICE ON TDP CHANAJEL WALL FUTURE CHANNEL 125� PLANS Y MONTGOMERY _45 _------ 41 `-------- _ 3g. EXTENS/ON 5 �\ ENGINEERS W ( -_- ---- -- -- -- ---=- =- - -- EASEMENT LINE — — — — 6 �26 3-__- F J30------------- ---J2� __,--_--•- t 96.24' 6 �--�- 'sc - _=mac_ _ ---` - J - --c-- y $ 441.48 ti ----- ----- -------- - CHANNEL V� s EX. C.L. FENCE' I ►` % G�tr � off, 36 h0 �' 66 ` �----'-��-- ----- --- ----- - - 6� �,�- -- —oti ---- ✓ . ~ b'*- -__, __; N � \;.\`�\\\\\ \ / \\\ �\\\\�`\ ,\\_ cvj I . / `, Q hti�Q.p hti�Q• f�'---,--� �, g2�Q. ��r hti. Q h\ �Q. gO�Q• S/ h ,� 1+ ,�'�-`„ c, +' \;\\\. `\\\ ; IN \ Z CNA NNE t L STA f32 67.18 Z I b I • c� \ \ EX. zolw/DE EASEMENT OF s-e C. FC.0. o o W 5�1p I FOR INGRESS � EGRESS PURPOSES 11 CURVE DATA NO. DELTA RADIUS LENGTH TAN 8'-02'-46" 700.00' 98.30 49.23 80-02'-46" 688.00, 96.62 48.39 80-02'-46" 712.00' 99.99 50.08 7'-45'-06" 712.00' 96.33 48.24 70-45'-06" 700.00' 1 94.71 1 47.43 ® 70-45'-06" 1 688.00' 1 93.08 1 46.61 F , REMOVE EXI T/NG WING - PER P.A?:, 11046 BOTI"OM CONTROL (3) tO � = ( _ WALLSA/N ERFERING �\\ PORTIONS OF EXISTING -- ` .�CHANNEL SEE DET, P " SHT• 4 C�! ah 6 s� SEE PROFILE 'ACOUNTY OF SAN BERNARDINO 44' 44' REVISIONS MARK DATE DESCRIPTION BY DEPARTMENT OF • � NarE: I'Mu2.�Fy FABRIC "RACED oN c�lAAl�1EL 8TRANSPORTq CAN FLOOD CONTROL 8' SUB -CRAM- FULL WIDTH OFCOiUCRETE _ CNAtvIJEL F-,PDM STA. 12L+35 T6i3FI>.ti►r 132pig ENGINEERING ASSOCIATES STA. t25. (AS BUILT QARBON CANYON CHANNEL 0 10 20 30 40 SO 120 I? Cf/_NO HILLS �°ARKtNAY \ �+\ 6355 TOPANGA CANYON BLVD., SUITE 407, STA. 126+00 TO STA. 133+00 _/ y � , � ,�, WOODLAND HILLS, CALIFORNIA 91367 SCALE HORIZ. 1" = 40' N�• �35f38 - 611990 TEL. (818) 710-9421 SUBMITTED BY: r PLANEX ENGINEERING ASSOCIATES 0 1 2 3 4 8 12 � C`Iti 4+� 1 APPROVED BY: DATE SCALE FILE No. AIIIIIIIIIIIIIII0 SIGNED: �zt� DATE: /��/� 8 SH 2 OF . SCALE VERT. f 1" = 4' _°- - PE NO. 33$08 COUNTY ROAD COMISS. FLOOD CONTROL ENC. DATE 0 N SECTION P-P P__ Y C. L. FENCE 2' COW. CURB � 6UTTER rw. CHANNEL P ` WALL DETAIL is P 0 o M to cz � Q O to Co O Tn DN w g EX. C.L. FENCE 4' O.L. FENCE �Q A2 aq� GROUTED ROCK A R/P - RAP 2' DEEP 45.44 rW <� \ � C 39 l0 FL �\ CHANNEL - S0. CAL . ED/SON C - - EASEMENT L /NE ----- 1 39" _ EX. C.L. FENCE 50.54 T.W 39.10FL. x�^ x x X 6' C. L . FENCE TAl C "P" SEE DE CAL TRANS R/W HEREON - f2'W/DE C.L. -- DOUBL E OR/VE GATE PLAN OF OUTLET STRUCTURE SCALE I"=20' rno nc ''"^"'^IEL DETAIL " K " 3- #4 - S' 2112 0. C. CHANNEL WALL CUT- OFF ` WALL # 4 Ca 450 @ 2 TYP. SECTION X-X 911 -- - -24' 4# 1P' S' v Etc• • � o cc .01 I. 2' GROUrEO Z ROCK RIP -RAP I X I X I I I UNCOMPACTED I BACK F/L L I I 1 ROCK BLANKET I (12"MAX. LEDGE ROCKS OR BOULDERS CUT- OFF WAL L SECTION A -A SCALE I"=6' VAR/ES /0" N 2; > 1 w 0 i W f C. Y. AGO. /NABAG /SEE TABLE (ON SHEET ¢� �/3 H EX. GROUND !1 ` VAR/ES 4" 0 WEEP HOLE @ 15' O.C. ti LOOSE ROCKS GROUTED ROCK 2. RlP-RAP SECTION D-D YAR/ES N h VAR/ES 11AR/ES YAR/ES FROM 24' TO 36' 1011 Q �1115 W 2'rH/C/f GROUTEDo� 1 C. Y. AG6. - co Q RIP -RAP w � to /N A BAGli N 71,7 L 213 Hi LOOSE ROCKS 213 H2 r W = VAR/ES VAR/ES UNCOMPACTED PILL CONC. WALL i CD DETAIL F" BOTTOM CONTROL SCALE : N.T.S. SECTION B-B 0FESJ%Q,� v NO. 33508 EXP. Ot LAL%f 6 ' C.L . FENCE TOP Of CHANNEL WALL 30.5' (N'LY SIDE WALL ) _—_--_---- 60.5' (SLY S/OE WALL) -- /0' a _j v� j s=a67% 64 2, CHANNEL SLAB 9 PLANEX ENGINEERING ASSOCIATES 6355 TOPANGA CANYON BLVD., SUITE 407, T. W FOOT/NG GROUTED ROCK RIP -RAP LOOSE ROCKS 62' SECTION C-C WOODLAND HILLS, CALIFORNIA 91367 TEL. (818) 710-9421 SUBMITW BY: PLANEX ENGINEERING ASSOCIATES — APPROVED BY: r, T;= SIGNED- _ DATE: /o11/�g _ PE NO. 33r�'O5 COUNTY ROAD COMISS. FLOOD CONTROL ENG. DATE �� 11 88 TOP OF BANK SCALE 1 "= 40' GROUTED ROCK RIP -RAP REINFORCED CONCRETE RECTANGULAR CHANNEL SIZE (FEET) 81 B2 B3 B4 B5 B6 B7 B8 B9 H (MAX) T1 T2 BAR NO. SPACING VERT LENGTH HORIZ LENGTH BAR NO. SPACING VERT LENGTH HORIZ LENGTH BAR NO. SPACING VERT LENGTH HORIZ LENGTH BAR NO. SPACING VERT LENGTH HORIZ LENGTH BAR N0. SPACING VERT LENGTH HORIZ LENGTH BAR NO. SPACING VERT LENGTH HORIZ LENGTH BAR NO. SPACING HORIZ LENGTH BAR NO. SPACING HORIZ LENGTH BAR NO. SPACING HORIZ LENGTH 19'— 0" 1'— 8" 2'— 0" #7018" 20'— 8" 15'— 0" #7018" 14'— 8" 10'— 0" #8018" 80— 8" 6'— 0" #6018" 20'— 8" 2'— 3" #6018" 14'— 3" 2'— 3" #6018" 8'— 8" 21— 3" #7018" 29'— 3" #7018" 16'— 0" #7018" 10'— 0" 24'— 0" 21— 0" 2'— 0" #9018- 25'— 8" 17'— 0" #9018- 13'— 8" 14'— 0" #10018- 81— 8" 89— 0" #6018" 25'— 8" 2'— 9" #6018" 15'— 8" 20— 9" #8018" 8'— 8" 2'— 9" #7018" 29'— 3' #7018" 18'— 0" #7018" 12'— 0" REINFORCED CONCRETE OUTLET STRUCTURE SUE (F" 81 82 83 84 85 H (MAX) T1 TZ W C" B D BAR NO. SPACING VERT LENGTH HORIZ LENGTH BAR NO. SPACING VERT LENGTH HORIZ LENGTH BAR N0. SPACING VERT LENGTH HORIZ LENGTH BAR NO. SPACING HORIZ LENGTH BAR NO. SPA ING 12'- 9" 1'- 3" 1'- 3" 10'- 6" 3'- 0" 7'- 6" 2'- 6" #5018" 13'- 7" 4'- 0" #5018" 9'- 1" 3'- 0" #609 5'- 4" 3'- 0" #8®15" 10'- 2" #5012" 10'- 0" 11- 0" 1'- 0" 8'- 0" 2'- 3" 5'- 9" 1'- 8" #5018" 10'- 7.5" 2'- 9" #5018" 7'- 8" 2'- 0" #509" 4'- 7" 2'- 0" #7018" 7'- 8" #5018" 8'- 0" 0'- 10" 1'- 0" 5'- 7" 1'- 9" 3'- 10" 1'- 3" #5018" 8'- 7.5" 2'- 3" #509" 5'- 8" 2'- 0" #5018" 5'- 3" #5418" 7'- 7" 0'- 10" 1'- 0" 5'- 4" 1'- 7" 3'- 9" I 1'- 3" #5018" 8'- 2.5" 2'- 2" #5018" 4'- 5" 2'- 0" #5018" 4'- 11" #5018" 6'- 0' 0'- 10" 1'- 0" 5'- 0" i'- 4" 3'- 8" I 1'- 0" #5®18" 6'- 7.5" 1'- 10" #5®18" 4'- 8" #5®', 8" 4'— 0" 0'— 10" 1'— 0" 4'— 0" 1'— 0" 3'— 0" #4018" 4'— 7.5" 1'— 8" #5018" 2'— 10" #4018" 0u' O.C. TYPICAL CHANNEL SECTION NOT TO SCALE 6' 10' 2.1 1 I 1.5' 2- ----#42218' 2.5' Bi BATTER H B2 B3 —41 B4 - • T2 I 315' #4218' #4q; . SY1L ABOUT THESE BARS EXTENDED OUT 1' FOR FUTURE L"MIECTION. ADDITIDU abbED IN FAL L Of /989. 14 --� 8" MIN. 3' 3.5' D • B5 12' T1 B C TOP OF FTG. TOP OF FTG. 24'- 0' (STEIN HT.) #9 O 18' TOP OF FTC. P0 O 18' F Va 24'- 0' 06 0 18' 13'— 11. I I II I #8 O 18' WALL OR SLAB OF OPEN CHANNEL SECTIONS WATERST( SMALLER SECTIONS CHANNEL WALL STEEL ARRANGEMENT CHANNEL WALL STEEL ARRANGEMENT SOUTH SIDE, EARTH FACE SOUTH SIDE, INSIDE FACE T L— f7 0 18- 19'— 0" #7 0 18' #8 O 18' CHANNEL WALL STEEL ARRANGEMENT NORTH SIDE, EARTH FACE J� BAR EXTENSION WILL BE 10'. FOR C=12", (MAINTAIN 2" CLEAR) VARIES PER PLAN OUTLET WALL STEEL ARRANGEMENT EARTH FACE NOT TO SCAB _j TOP OF FTG. �so1e' 19'— 0' 0e 0 18' CHANNEL WALL STEEL ARRANGEMEN -r NORTH SIDE, INSIDE FACE thickness less /Am /he rv// thickness. v lit preinolded expansion /owl filler unless other thckness add/o' ma/erlal is shown e/sewwe rwoterstop -Front face of wall WALL EXPANSION JO/N)r 15 bar - Aownd/np stnP wohrstgo to ho►r 5.0r more pairs of rwsrd ribs to provio♦r 0. / sq en. men. rib cross -section �\ oreo on Loch half of Me wv/rrsfw. Z(r/,na i //e mM. //bLlrfes7 M" Seal oet.ew filter and "cte"AW \ ! m5*1 w// be pe ffll~ in the ovw li!' Qf the ! wob for wire, rugs, etc.. Tie web ro 3 reinforcup rJ bars /Z'moe. inArrvo/s to support the vulerstop bar in proper positron durwq commie Riammen/ . Alfirmtiw pima/ roar be submitted ter ogoro.Wl of the Etquwr. . WATERSMP TV A l Gn.7 IV v u mKomm 1' o.wT c119?CAr`V WT14 z /a' owc-un: nrn FOR WALLS AND SLABS JOINING OPEN AND COVERED SECTIONS FOR INVERT SLAB S. WALL BASE LONGITUDINAL CONSTRUCTION JOINT - OPEN CHANNEL WALL OR SLAB OF COVERED SECTIONS W CHANNEL OUTLET WALL NOT TO SCALE